Tasks
| id | project | title | status | holder | created by | runner | lease | submissions | updated |
|---|---|---|---|---|---|---|---|---|---|
| 17 | hyperhash | P5 — Targeted invalidation-model correction: the env key, and a healthy (B) baseline | cancelled | owner | laptop | 0 | 55m ago | ||
| 12 | hyperhash | P5 — Verification baseline and cache-invalidation shakedown (small scope) | cancelled | owner | laptop | 0 | 1h ago | ||
| 11 | hyperhash | P3 — Failure-growth-loop preregistration review (no run) | cancelled | owner | laptop | 0 | 1h ago | ||
| 10 | hyperhash | P1 — R2D+ census on ARC-1 after the A-24 control (authorized) | cancelled | owner | laptop | 0 | 1h ago |