| 16 | hyperhash | P3 — Failure-growth-loop: targeted successor preregistration (three pinned changes) | done | laptop-runner | owner | laptop | | 1 | 1m ago |
| 15 | hyperhash | P5 — Verification baseline and cache correctness (bounded validation) | done | laptop-runner | owner | laptop | | 1 | 5m ago |
| 14 | hyperhash | P3 — Failure-growth-loop preregistration audit (read-only) | done | laptop-runner | owner | laptop | | 1 | 5m ago |
| 7 | hyperhash | P1 — Repair and resolve A-24: successor prereg (option iii) and control run | done | laptop-runner | owner | laptop | | 1 | 1h ago |
| 6 | hyperhash | P2 — Substrate after A-25: why near-inert on natural problems, and what would change it | done | laptop-runner | owner | laptop | | 1 | 1h ago |
| 5 | hyperhash | P5 — Verification turnaround: baseline and layered-evidence design | done | laptop-runner | owner | laptop | | 1 | 1h ago |
| 3 | hyperhash | P3 — Failure-to-improvement loop: design and preregistration | done | laptop-runner | owner | laptop | | 1 | 1h ago |